Salford Priors,
Warwickshire
Phase 3
Residential
Under Promotion
The proposal comprises a residential development of up to 100 dwellings, with associated blue and green infrastructure, landscape buffering, open spaces and BNG enhancement.
The development would comprise a mix of house types and tenure with 35% of the housing being affordable.
The existing access from School Road is retained and improved to enable a new access to be formed into the development from the existing orchard farm access route.
Associated infrastructure on site would include:
- Existing landscaping would be retained, supplemented and managed.
- Tree loss would be limited, with the objective of retaining as far as possible the higher quality trees.
- Replacement planting and new landscaping would be provided to mitigate loss, as part of an overall BNG strategy seeking net gain.
- On site drainage attenuation.
- Footpath connections to the existing Public Rights of Way network.